Contractor: EKFB Products: EasyPIT® ULTRA Access Chambers, FORTIS Multiple Duct Cable Protection Project: Greatworth Green Tunnel is the longest green tunnel on the HS2 route, stretching for 1.7 miles through West Northamptonshire. It is one of five cut-and-cover, or green, tunnels on the route. Unlike bored tunnels, green tunnels are constructed at the […]
Contractor: Jones Bros Ruthin Products: EasyPIT® ULTRA Access Chambers, Ductile Iron Covers & Frames, Fabricated Steel Covers & Frames Project: The Swansea North 400kV Substation, commissioned by National Grid, is a state-of-the-art facility developed to transfer demand from the existing Swansea North 275kV substation. The project encompassed the design, procurement, construction, commissioning, and successful […]
Contractor: Volkerfitzpatrick Products: EasyPIT® ULTRA Access Chambers Project: Advanced is proud to have supplied its EasyPIT Ultra access chamber system to another prestigious UK infrastructure project – Sizewell C, the new twin-reactor nuclear power station currently under construction on the Suffolk coast. Once operational, Sizewell C will generate around 3.2 GW of low-carbon […]
Project: Strensham Sewage Treatment Works Location: Strensham, Worcestershire Contractor: Coffey Construction UK The Strensham Water Treatment Works is currently undergoing a significant upgrade project managed by Severn Trent Water, with Coffey Construction UK serving as a key contractor. Advanced were engaged to supply their EasyPIT ULTRA Access Chamber System together with EasyGRIP Composite Covers in […]
Project: HMP Channings Wood Location: Newton Abbott Contractor: Churngold Construction Ltd Following several months of negotiations and discussions, Advanced have been awarded a contract for the supply of access chambers and ductile iron covers and frames for HMP Channings Wood in Devon. The oversized chambers include 1500x1500mm, 1800x1800mm and 2000x2000mm clear openings, all with D400 […]
Project: Extra MSA Group – M62 Location: Warrington Contractor: Bethel Construction Ltd PRODUCTS Associated: EasyPIT Connect duct access chambers & EasyGRIP composite covers Advanced have recently been awarded a supply contract for the Extra MSA Group latest development, Warrington Motorway Service Area (MSA) at Junction 11 of the M62. A mix of 450x450mm, 600x600mm and […]
We recently supplied our EasyPIT® ULTRA chamber systems and EasyGRIP composite covers to support infrastructure works at National Grid’s Sellindge Substation in Ashford, Kent. Britain’s critical terminal for the HVDC Cross-Channel interconnector, helping connect UK and European electricity grids.
We recently supplied our EasyPIT® ULTRA and ecoNOMY® chamber systems alongside associated access covers and frames to the infrastructure works at the SPARK Walsall Logistics Hub.
We are thrilled to announce that Advanced Building Composites Limited is officially changing its name to Advanced Infrastructure Systems Ltd. This name change is an important milestone in our journey as we continue to grow, evolve, and better serve you.